Serving the Greater Columbus Area
    Warehouse Relocation system for Lancaster, Ohio warehouses
    Lancaster, Ohio

    Warehouse Relocation Services in Lancaster, OH

    Warehouse relocation in Lancaster usually comes up for one of three reasons: an operation is moving to a different building, consolidating two sites into one, or shifting a production line into space that didn't exist before. Glass and ceramics plants, industrial manufacturers, wholesale suppliers and packaging operations around Lancaster Industrial Park and the River Valley area are the ones most likely to be weighing that move, often with rack that still has useful life left in it.

    The work starts with tearing down the existing system bay by bay, labeling every frame, beam and connector so the configuration can go back together without guesswork, and coordinating transport to the new address against the move date.

    614-379-4436

    Why Lancaster Warehouses Work With Us

    Lancaster sits along the US-33 southeast corridor, and the buildings strung along it range from older shells near Memorial Drive to newer construction near Ety Road. A relocation plan has to account for whichever building the operation is moving into, since the new clear height and column spacing rarely match the old one closely enough to reuse a layout unchanged.

    Glass and ceramics plants, industrial manufacturers, wholesale suppliers and packaging operations around Lancaster Industrial Park and the River Valley area are the operations most often behind a relocation — moving to a new building, combining two sites, or adding a production line into space the old building didn't have. The rack inventory from the old site gets measured against the new one before anything is torn down, so the plan accounts for what can be reused.

    Working in Fairfield County means the teardown, transport and reinstallation can all be scheduled around the actual move date rather than coordinated at a distance through a third party, which keeps rack and inventory from sitting idle at either end of the move.

    Free warehouse consultation
    CAD layout with position counts
    Installation by trusted installation partners
    Pallet rack components and warehouse storage layout
    Warehouse racking rows for relocation layout planning

    Operations We Rack Around Here

    Nearby areas we work in regularly include the US-33 southeast corridor, Lancaster Industrial Park, River Valley, Memorial Drive corridor, Ety Road.

    Glass and ceramics
    Industrial manufacturing
    Wholesale supply
    Packaging

    How Warehouse Relocation Works

    Moving buildings without losing the racking plan that already works for your operation.

    1

    New building layout first

    Before anything comes down at the current site, we measure the new building's clear height, column spacing, and dock positions and draw a CAD layout sized to that space, so the relocation has a destination plan rather than a plan to recreate the old footprint.

    2

    Labeled teardown

    Frames, beams, and connectors are tagged by bay and row as they come down, sequenced around whatever the old building is still shipping or receiving, so nothing comes apart as an unsorted pile of steel.

    3

    Transport coordination

    Labeled components move between sites on a schedule tied to the new layout, so beams and frames arrive grouped by the bay they're going back into instead of needing to be re-sorted on arrival.

    4

    Reinstallation to the new layout

    Crews anchor, plumb, and level every frame against the new CAD drawing, re-hang decking and guarding, and post capacity tags for the finished rows.

    What a Lancaster Warehouse Relocation Project Includes

    A relocation project for a Lancaster operation starts with an inventory of the rack already standing: frame depth, beam length, connector style and bay count, alongside the pallet or case loads the system currently carries. That inventory decides what gets torn down intact, what gets labeled for reassembly, and what won't make sense to move once the new building's column grid and clear height are on paper.

    Teardown crews work bay by bay, labeling frames, beams and hardware as they come apart so the new layout reuses components in the right positions instead of sorting unmarked steel on the other end. Transport is scheduled against the move date the operation is actually working to, not a separate internal calendar.

    On the new site, the layout is redrawn from scratch for that building's clear height, column spacing and dock positions, since a plan built for a Lancaster building along the US-33 southeast corridor rarely maps onto a different footprint without changes.

    Reinstallation follows the labeled plan, with crews anchoring, plumbing and leveling frames in their new positions and re-hanging decking, carts or rails as the system requires. If the new building has more usable cube than the old one, additional rack gets worked into the plan at this stage rather than tacked on afterward.

    Operations relocating between Columbus-area buildings with different clear heights
    Leases ending on a timeline that requires the current warehouse vacated
    Facilities consolidating two buildings into one new location
    Companies that want existing rack reused rather than replaced outright
    Operations adding new rack positions as part of the move
    Call 614-379-4436

    Recent Installations

    Racking projects completed for warehouses across Central Ohio.

    Drive-in pallet rack system installed in a warehouse
    Drive-in pallet rack
    Carton flow rack bays with gravity roller beds
    Carton flow rack
    Tall selective pallet rack rows with wire decking
    Selective pallet rack
    Warehouse aisle of selective pallet rack with wire decking
    Selective pallet rack with wire decking
    Newly installed pallet rack rows in an empty warehouse
    New warehouse rack installation
    Long rows of green and orange selective pallet rack
    Selective pallet rack rows
    Wide view of a warehouse racking layout with wire decking
    Warehouse racking layout
    Multiple rows of pallet rack in a distribution warehouse
    Pallet rack rows
    Cantilever rack with orange arms installed against a warehouse wall
    Cantilever rack
    Push back pallet rack carts and rails installed in a cold storage room
    Push back pallet rack

    Get a Warehouse Relocation Quote for Your Lancaster Warehouse

    Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call 614-379-4436.

    Columbus Pallet Rack

    4551 Wright Ave.

    Unit #2092

    Columbus, OH 43213

    614-379-4436

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Warehouse Relocation Questions We Hear Most

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Central Ohio, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Columbus, we serve the entire Greater Columbus region with industrial pallet racks and warehouse storage solutions.

    Columbus Pallet Rack

    Address

    4551 Wright Ave.
    Unit #2092
    Columbus, OH 43213

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Warehouse Relocation in Lancaster?

    Call 614-379-4436 or request a quote and we will get a layout started.

    614-379-4436
    Call Now