Serving the Greater Columbus Area
    Cantilever Rack system for Hilliard, Ohio warehouses
    Hilliard, Ohio

    Cantilever Rack in Hilliard, OH

    Cantilever rack in Hilliard can organize pipe and long sections for HVAC and plumbing supply without forcing them through front-column openings. Braced uprights carry projecting arms so stock can be loaded across its length. The arrangement needs to support both complete bundles and the smaller quantities pulled for orders.

    Hilliard Industrial Parkway and Roberts Road establish local context for wholesale supply layouts. Around the I-270 west corridor, we would connect the long-material positions to order assembly while keeping ordinary pallet receiving on a separate path.

    614-379-4436

    Cantilever storage rack for opened pipe bundles

    Cantilever storage rack selection for supply work begins with how the remaining stock is held after a bundle opens. Round pipe may roll or spread unless the specified support and retention details suit the picking method. Length, diameter and quantity should be recorded for each stock group rather than hidden inside one total inventory weight.

    Britton Parkway and Roberts Road are useful anchors for reviewing wholesale buildings with several handling tasks. A row placed beside order assembly may shorten a transfer, but it cannot consume the aisle needed to deliver incoming pipe. We compare storage, picking and replenishment as connected movements on the free CAD plan.

    We operate within Warehouse Equipment & Supplies Co. as a division; the parent company has supplied and installed warehouse equipment since 1997. That equipment background supports a quotation built from the stock schedule and handling method, not a presumed universal arm spacing.

    Pipe groups recorded
    Retention and retrieval aligned
    Replenishment path compared
    Cantilever warehouse racking holding steel tubing
    Cantilever rack storing lumber and wood products

    Operations We Rack Around Here

    Hilliard Industrial Parkway and Britton Parkway relate to wholesale and plumbing-supply activity. On Roberts Road, a long-stock arrangement should leave room for incoming bundles and the movement toward order assembly without combining those tasks into one undefined aisle.

    Wholesale distribution
    HVAC and plumbing supply
    Sporting goods
    Light manufacturing

    Cantilever rack access to supply orders

    1

    Pipe groups

    Distinguish diameters, lengths and open-bundle quantities before assigning levels. The stock list should show whether a position is replenished by truck and selected by hand or cart.

    2

    Retention detail

    Round material needs a defined way to remain on its supports. Choose that detail around the retrieval method rather than adding an obstruction that prevents practical fork placement.

    3

    Shared aisles

    Cantilever rack provides an open loading face, but long pipe still occupies a wide movement envelope. Draw incoming deliveries and outgoing selections through the same surrounding floor area.

    4

    Stock comparison

    Use pallet bays for boxed fittings when their existing access remains suitable. Long-material storage should resolve length and support issues instead of displacing an appropriate case-picking arrangement.

    Cantilever racking ratings and stock groups

    Cantilever racking arms should be chosen from bundle depth and maximum load, with ratings tied to their actual projection. Column loading across multiple levels also needs verification. A run can have apparently modest individual bundles while its occupied levels exceed the intended upright arrangement, which is why the full loading schedule matters.

    Support spacing follows pipe stiffness and length, including the permitted overhang at each end. Small sections or flexible material may require closer contact points. The design also considers where forks enter and how a piece is lifted clear without catching the level above or displacing neighboring stock.

    Single-sided rows can serve a defined supply boundary, while double-sided islands need space for truck or cart access on both faces. Evaluate the longest carried load through turns and toward order assembly. Selective bays should continue to hold palletized fittings and boxed items when full-pallet or case access suits them.

    Indoor inventory and outdoor pipe storage call for separate exposure reviews, including finish and winter working access. Once the plan is agreed, the quotation lists arms, uprights, bases, bracing and installation responsibilities. Experienced installation crews we schedule and manage assemble the approved configuration and leave it anchored to the floor. Arm elevations and load plaques are checked against the documented stock groups so later picking and replenishment follow the same limits.

    HVAC long sections
    Plumbing pipe bundles
    Wholesale order selection
    Call 614-379-4436

    Recent Installations

    Racking projects completed for warehouses across Central Ohio.

    Drive-in pallet rack system installed in a warehouse
    Drive-in pallet rack
    Carton flow rack bays with gravity roller beds
    Carton flow rack
    Tall selective pallet rack rows with wire decking
    Selective pallet rack
    Warehouse aisle of selective pallet rack with wire decking
    Selective pallet rack with wire decking
    Newly installed pallet rack rows in an empty warehouse
    New warehouse rack installation
    Long rows of green and orange selective pallet rack
    Selective pallet rack rows
    Wide view of a warehouse racking layout with wire decking
    Warehouse racking layout
    Multiple rows of pallet rack in a distribution warehouse
    Pallet rack rows
    Cantilever rack with orange arms installed against a warehouse wall
    Cantilever rack
    Push back pallet rack carts and rails installed in a cold storage room
    Push back pallet rack

    Review long supply stock and picking quantities

    List pipe diameters, lengths, pack weights and the quantities usually selected for orders. A free consultation can map support levels and replenishment access before we quote the equipment schedule and installation scope. Call 614-379-4436.

    Columbus Pallet Rack

    4551 Wright Ave.

    Unit #2092

    Columbus, OH 43213

    614-379-4436

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Hilliard pipe-storage questions

    Hilliard warehouse rackingCantilever rack product detailsPallet flow rack in HilliardDrive-in rack in Hilliard

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Central Ohio, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Columbus, we serve the entire Greater Columbus region with industrial pallet racks and warehouse storage solutions.

    Columbus Pallet Rack

    Address

    4551 Wright Ave.
    Unit #2092
    Columbus, OH 43213

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Cantilever Rack in Hilliard?

    Call 614-379-4436 or request a quote and we will get a layout started.

    614-379-4436
    Call Now