Serving the Greater Columbus Area
    Warehouse Relocation system for Hilliard, Ohio warehouses
    Hilliard, Ohio

    Warehouse Relocation Services in Hilliard, OH

    Moving a warehouse out of a building near Roberts Road industrial area means the racking has to come apart, travel, and go back up somewhere else without losing track of which beam belongs where. The project covers teardown of the existing rack, labeling every component, coordinating transport to the new address, drawing a layout for the new space, and reinstalling once the building near the I-270 west / Roberts Road corridor is ready.

    Wholesale distribution and HVAC and plumbing supply operations relocating out of Hilliard usually land in a building with a different clear height, column grid or dock layout near Hilliard Industrial Parkway and Britton Parkway, so the old row spacing rarely transfers as-is. The new layout gets drawn against the new building's actual dimensions.

    614-379-4436

    Why Hilliard Warehouses Work With Us

    Relocating out of a building near Roberts Road industrial area is a chance to correct a layout that never quite fit the operation, which is why the new floor plan gets drawn from scratch rather than copied from the old one.

    Sporting goods and light manufacturing operations moving between Hilliard sites near Hilliard Industrial Parkway often land in a building with a different clear height or overhead clearance, so beam elevations and lane depths get reset to the new space rather than carried over by assumption.

    Transport, labeling and the new install get coordinated around a single schedule, which keeps the teardown, the move and the reinstallation near Britton Parkway from splitting into three separate projects with three separate timelines.

    A Hilliard manufacturer needed to relocate five racks of pallet storage to a new Reynoldsburg plant. Our relocation team managed the Grove City logistics, completing the teardown and re-anchoring in record time so the client could resume shipping operations without facing the typical delays associated with moving large-scale industrial storage equipment between different sites.

    Free warehouse consultation
    CAD layout with position counts
    Installation by trusted installation partners
    Pallet rack components and warehouse storage layout
    Warehouse racking rows for relocation layout planning

    Operations We Rack Around Here

    Nearby areas we work in regularly include the I-270 west / Roberts Road corridor, Hilliard Industrial Parkway, Britton Parkway, Roberts Road, Trueman Boulevard.

    Wholesale distribution
    HVAC and plumbing supply
    Sporting goods
    Light manufacturing

    How Warehouse Relocation Works

    Moving buildings without losing the racking plan that already works for your operation.

    1

    New building layout first

    Before anything comes down at the current site, we measure the new building's clear height, column spacing, and dock positions and draw a CAD layout sized to that space, so the relocation has a destination plan rather than a plan to recreate the old footprint.

    2

    Labeled teardown

    Frames, beams, and connectors are tagged by bay and row as they come down, sequenced around whatever the old building is still shipping or receiving, so nothing comes apart as an unsorted pile of steel.

    3

    Transport coordination

    Labeled components move between sites on a schedule tied to the new layout, so beams and frames arrive grouped by the bay they're going back into instead of needing to be re-sorted on arrival.

    4

    Reinstallation to the new layout

    Crews anchor, plumb, and level every frame against the new CAD drawing, re-hang decking and guarding, and post capacity tags for the finished rows.

    What a Hilliard Warehouse Relocation Project Includes

    The project opens with a teardown plan for the current building near Roberts Road industrial area: which rows come down first, how components get labeled so they land in the right bay at the new address, and what gets packed for transport versus what gets replaced rather than moved.

    Transport gets coordinated to the new site near the I-270 west / Roberts Road corridor, with labeled components tracked against the new layout so crews are not guessing which beam or frame goes where once the truck arrives.

    A new layout gets drawn for the building near Hilliard Industrial Parkway or Britton Parkway, accounting for the new clear height, column grid and dock placement.

    Reinstallation follows the new drawing: frames get anchored, plumbed and leveled, beams go in at the new elevations, and bays get labeled and capacity-tagged before the building near Hilliard goes back into operation. New rack gets added wherever the move leaves a gap the old inventory doesn't fill.

    Bay assignments and beam elevations from the new layout stay the reference document, so a question about where a component landed in the Hilliard rebuild near Britton Parkway has a record behind it.

    Operations relocating between Columbus-area buildings with different clear heights
    Leases ending on a timeline that requires the current warehouse vacated
    Facilities consolidating two buildings into one new location
    Companies that want existing rack reused rather than replaced outright
    Operations adding new rack positions as part of the move
    Call 614-379-4436

    Recent Installations

    Racking projects completed for warehouses across Central Ohio.

    Drive-in pallet rack system installed in a warehouse
    Drive-in pallet rack
    Carton flow rack bays with gravity roller beds
    Carton flow rack
    Tall selective pallet rack rows with wire decking
    Selective pallet rack
    Warehouse aisle of selective pallet rack with wire decking
    Selective pallet rack with wire decking
    Newly installed pallet rack rows in an empty warehouse
    New warehouse rack installation
    Long rows of green and orange selective pallet rack
    Selective pallet rack rows
    Wide view of a warehouse racking layout with wire decking
    Warehouse racking layout
    Multiple rows of pallet rack in a distribution warehouse
    Pallet rack rows
    Cantilever rack with orange arms installed against a warehouse wall
    Cantilever rack
    Push back pallet rack carts and rails installed in a cold storage room
    Push back pallet rack

    Get a Warehouse Relocation Quote for Your Hilliard Warehouse

    Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call 614-379-4436.

    Columbus Pallet Rack

    4551 Wright Ave.

    Unit #2092

    Columbus, OH 43213

    614-379-4436

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Warehouse Relocation Questions We Hear Most

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Central Ohio, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Columbus, we serve the entire Greater Columbus region with industrial pallet racks and warehouse storage solutions.

    Columbus Pallet Rack

    Address

    4551 Wright Ave.
    Unit #2092
    Columbus, OH 43213

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Warehouse Relocation in Hilliard?

    Call 614-379-4436 or request a quote and we will get a layout started.

    614-379-4436
    Call Now