Serving the Greater Columbus Area
    Drive-In Rack system for Hilliard, Ohio warehouses
    Hilliard, Ohio

    Drive-In Rack in Hilliard, OH

    An aisle is floor space the rack cannot use, and drive-in rack is built to eliminate it. The forklift drives into the structure and sets pallets on continuous rails, which packs more positions into a Hilliard footprint near Roberts Road industrial area than an aisle-based system allows — with the tradeoff that only pallets at the open end of the lane are reachable until the ones in front clear.

    A lane open at one end runs last in, first out at maximum density; a lane open at both ends allows first-in, first-out but costs a few positions and a second aisle. We lay out drive-in lanes around the exact lift truck working buildings along Hilliard Industrial Parkway and Britton Parkway, then set the resulting position count against a selective layout of the same footprint.

    614-379-4436

    Why Hilliard Warehouses Work With Us

    Bulk wholesale distribution and light manufacturing volume near Roberts Road industrial area tends to sit in a small number of SKUs held in quantity, exactly the pattern that makes a drive-in lane worth its access cost — a lane that stays full earns that cost back quickly.

    Lane width, rail height and mast clearance get sized to the specific forklift running the Hilliard Industrial Parkway floor rather than a generic spec, since an overly tight lane slows every cycle and an overly wide one gives back positions for nothing.

    Where the SKU mix near Britton Parkway blends bulk pallets with a faster-moving pick line, selective rack at the front paired with drive-in lanes behind it near Trueman Boulevard typically outperforms committing the whole floor to a single system.

    Moving five racks of drive-in steel from a Hilliard warehouse to Grove City involves a detailed inspection of the load rails and uprights. During the relocation, we coordinate the Reynoldsburg logistics to ensure the frames are plumb and level in the new bay, providing a secure environment for high-density pallet storage and safe forklift entry points.

    Free warehouse consultation
    CAD layout with position counts
    Installation by trusted installation partners
    Drive-in pallet rack lanes fitted with continuous rails
    Drive-in warehouse racking loaded with bulk pallets

    Operations We Rack Around Here

    Nearby areas we work in regularly include the I-270 west / Roberts Road corridor, Hilliard Industrial Parkway, Britton Parkway, Roberts Road, Trueman Boulevard.

    Wholesale distribution
    HVAC and plumbing supply
    Sporting goods
    Light manufacturing

    How Drive-In Rack Works

    Storage lanes replace internal access aisles. Forklifts enter the structure to handle bulk pallets.

    1

    Continuous rails, not beams

    Pallets rest on rails carried by upright frames rather than individual beam levels, so a lane accepts pallet after pallet at the same elevation.

    2

    The truck enters the lane

    The driver travels inside the bay to place or retrieve each load. Lane width, rail height, and mast clearance get dimensioned to that specific truck, not a generic one.

    3

    One open end or two

    One open end gives LIFO and the highest density available. Two open ends give FIFO with slightly fewer positions, since each lane now needs clearance from both sides.

    4

    Guarding built into the design

    Guide rails, column guards, and rail-end protection are part of the spec from the start, because lift trucks enter the structure during loading and retrieval.

    What a Hilliard Drive-In Rack Project Includes

    The design starts with the forklift rather than the rack: mast height, overall width, load backrest and turning clearance set the lane dimensions before anything gets drawn for the Hilliard floor near Roberts Road industrial area.

    Next comes SKU depth. Drive-in rewards a lane that holds many pallets of one item and works against you the moment the mix near Hilliard Industrial Parkway gets more varied — a lane that never fills is an expensive way to store less than selective rack would have held in the same space.

    The quote itemizes frames, rails, rail supports, guide rails and column protection, with a drawing showing lane depth, rail elevations and the total position count. Installation anchors and plumbs every rail run, then verifies a loaded pallet travels the full lane near Britton Parkway before handover.

    Lane dimensions and guarding stay documented in the CAD layout. Future additions are quoted against the existing lane configuration, with new components checked for compatibility before ordering.

    Rail elevations and position counts stay on the lane drawing, so resizing a lane or adding a rail run near Britton Parkway in Hilliard starts from documented numbers rather than a re-measure.

    High volume of a small number of SKUs
    Seasonal or buffer inventory held in bulk
    Cold storage and freezer rooms where cube matters most
    Product too fragile to floor-stack more than two high
    Buildings where floor space, not height, is the binding constraint
    Call 614-379-4436

    Recent Installations

    Racking projects completed for warehouses across Central Ohio.

    Drive-in pallet rack system installed in a warehouse
    Drive-in pallet rack
    Carton flow rack bays with gravity roller beds
    Carton flow rack
    Tall selective pallet rack rows with wire decking
    Selective pallet rack
    Warehouse aisle of selective pallet rack with wire decking
    Selective pallet rack with wire decking
    Newly installed pallet rack rows in an empty warehouse
    New warehouse rack installation
    Long rows of green and orange selective pallet rack
    Selective pallet rack rows
    Wide view of a warehouse racking layout with wire decking
    Warehouse racking layout
    Multiple rows of pallet rack in a distribution warehouse
    Pallet rack rows
    Cantilever rack with orange arms installed against a warehouse wall
    Cantilever rack
    Push back pallet rack carts and rails installed in a cold storage room
    Push back pallet rack

    Get a Drive-In Rack Quote for Your Hilliard Warehouse

    Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call 614-379-4436.

    Columbus Pallet Rack

    4551 Wright Ave.

    Unit #2092

    Columbus, OH 43213

    614-379-4436

    Monday - Friday: 8:00 AM - 6:00 PM

    We respect your privacy. Your information will never be shared.

    Drive-In Rack Questions We Hear Most

    Nearby Areas We Also Serve

    Our delivery and installation territory covers Central Ohio, so one team can handle multiple buildings for the same company.

    Where We Work

    Located in Columbus, we serve the entire Greater Columbus region with industrial pallet racks and warehouse storage solutions.

    Columbus Pallet Rack

    Address

    4551 Wright Ave.
    Unit #2092
    Columbus, OH 43213

    Business Hours

    Monday - Friday: 8:00 AM - 6:00 PM
    Saturday: Closed
    Sunday: Closed

    Need Drive-In Rack in Hilliard?

    Call 614-379-4436 or request a quote and we will get a layout started.

    614-379-4436
    Call Now