Pushback Rack in Gahanna, OH
Space runs out before growth does for a lot of Gahanna operations. Buildings near Taylor Station Road and Morrison Road in Gahanna serve air freight forwarders, aerospace parts suppliers, medical distributors and electronics importers, and the day-to-day strain shows up the same way almost every time: pallets of air cargo and aerospace components staged two and three deep on the floor because the existing single-deep rack can't hold a full inbound load. Gahanna sits next to John Glenn Columbus International Airport, so a share of the buildings along Taylor Station Road and Morrison Road were built around trucks feeding or pulling from air cargo rather than a typical over-the-road dock schedule. This specific rack geometry recovers every inch of accessible height near Taylor Station Road, turning cluttered floor space into organized storage without expanding the property footprint near the airport.
Planning a successful installation requires analyzing your actual airport-bound freight first: we measure every pallet profile and lift truck spec to ensure the steel performs under real-world pressure near Taylor Station Road. Those numbers determine whether pushback rack actually fits the way Gahanna needs it to, and a layout with a price comes back before any steel is ordered for a building along the airport corridor.
Why Gahanna Warehouses Work With Us
Gahanna buildings along Taylor Station Road and Gahanna Industrial Parkway range from decades-old low-bay construction to recent shells with taller clear heights, and a pushback rack layout drawn for one rarely drops into the other without rework. Every bay is configured to work around your Taylor Station Road facility’s unique column spacing and overhead obstructions, ensuring no storage position is lost to poor planning near the airport.
Air freight forwarders, aerospace parts suppliers, medical distributors and electronics importers working out of Airside Business Park generally store pallets of air cargo and aerospace components staged two and three deep on the floor, and a pushback rack lane has to be built around that exact profile rather than a general-purpose one. Getting the rotation pattern and lane depth right at the start keeps Gahanna operations from needing a second project later just to undo handling habits the first layout forced on them.
Since air cargo and aerospace components often end up staged two or three deep on the floor when single-deep racks reach capacity, we design our layouts to solve these specific airport corridor bottlenecks, the layout work accounts for how trucks and lift equipment actually move through the dock, not only how many rack positions fit on a floor plan. That's the difference between a pushback rack project in Gahanna that holds up under daily handling and one that looks right on paper but creates new bottlenecks once it's loaded.


Operations We Rack Around Here
Nearby areas we work in regularly include the airport / Morrison Road corridor, Gahanna Industrial Parkway, Taylor Station Road, Morrison Road, Airside Business Park.
How Pushback Rack Works
Two to six pallets deep from one aisle, without giving up much reach.
Loading from the aisle
The driver sets the first pallet on the front cart. Each pallet added after that pushes the cart train deeper into the lane, so one aisle handles the whole depth.
Carts nested on rails
Steel carts with nylon or steel wheels ride inclined rails, each nesting under the one ahead of it - that nesting is what makes multi-deep storage possible from a single face.
Retrieval by gravity
Pull the front pallet and the next cart rolls forward on the incline to the pick face. No driving into the lane, no repositioning pallets by hand.
Last in, first out
Each lane runs LIFO. That suits fast-turning product and any operation managing rotation by lane rather than by individual pallet date.
What a Gahanna Pushback Rack Project Includes
Those figures set the lane depth, beam elevation and bay spacing before a layout drawing is started.
The system runs on nested carts riding a sloped rail: a pallet set behind the first pushes the whole line back one position, and pulling the front pallet lets gravity feed the next one forward. That geometry lets a single aisle serve several pallets of depth per lane, which matters on Taylor Station Road buildings where the column spacing won't allow a second aisle to be cut in later. A layout then shows bay and lane dimensions, aisle widths and a position count, so the gain over the current floor storage or outdated rack is visible before anything is committed to steel.
Once a layout is approved, pushback rack components get ordered against that drawing and installed bay by bay: frames are anchored and plumbed, the load-bearing elements specific to pushback rack go in at the elevations the drawing calls for, and each lane gets a capacity tag so the floor crew knows what it's rated to hold.
After the system is up, the same crew handles additional bays, reconfiguration if pallet sizes or SKU counts change, and replacement of any frame or rail damaged by a lift truck. For a Gahanna operation near Taylor Station Road, that keeps the building's rack plan under one point of contact instead of pulling in a new vendor every time something changes.
Recent Installations
Racking projects completed for warehouses across Central Ohio.










Get a Pushback Rack Quote for Your Gahanna Warehouse
Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call 614-379-4436.
Columbus Pallet Rack
4551 Wright Ave.
Unit #2092
Columbus, OH 43213
614-379-4436Monday - Friday: 8:00 AM - 6:00 PM
Pushback Rack Questions We Hear Most
Warehouse Storage Services in Gahanna

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Storage lanes replace internal access aisles. Forklifts enter the structure to handle bulk pallets.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Warehouse Relocation
Moving buildings without losing the racking plan that already works for your operation.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers Central Ohio, so one team can handle multiple buildings for the same company.
Where We Work
Located in Columbus, we serve the entire Greater Columbus region with industrial pallet racks and warehouse storage solutions.
Columbus Pallet Rack
Address
4551 Wright Ave.
Unit #2092
Columbus, OH 43213
Phone
614-379-4436Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Pushback Rack in Gahanna?
Call 614-379-4436 or request a quote and we will get a layout started.