Pallet Flow Rack in Newark, OH
Pallet flow rack questions in Newark often come from operations that need rotation they can point to, not just describe. Aerospace and defense suppliers and data center supply chain vendors around Newark Industrial Park and the Port Authority campus along Thornwood Drive frequently carry dated or lot-controlled material, and a pushback lane's last-in-first-out order doesn't satisfy that on its own.
In a flow lane, pallets load at the high end and travel down braked rollers or wheel tracks at a controlled pace, so the oldest pallet in the lane sits at the pick face by default. That takes an aisle on both the load side and the pick side, which uses more floor per position than pushback, but it pays that back for a Newark operation where a small number of pick faces need to represent a large volume of stored product.
Why Newark Warehouses Work With Us
Buildings along the SR-16 corridor near the Heath-Newark-Licking County Port Authority range from older manufacturing shells near Thornwood Drive to newer spec space closer to SR-16, and a pallet flow layout has to be drawn against whichever one is actually in use.
Newark's aerospace and defense suppliers, data center supply chain vendors, industrial manufacturers and regional distributors often work under lot traceability or shelf-life requirements, which is the kind of load profile flow lanes are built around. Lane pitch and incline get set to that requirement instead of defaulting to the deepest lane the building can hold.
Based in Licking County, load-side and pick-side aisle widths get verified against the real Newark building during design, which keeps a flow lane from coming up a foot short once the rollers and carts are already ordered. We keep site notes and measurements on file after the first visit to Newark, so a follow-up visit or a later phase of the same project does not start from a blank sheet.


Operations We Rack Around Here
Nearby areas we work in regularly include the SR-16 / Licking County corridor, Newark Industrial Park, Heath-Newark-Licking County Port Authority, Thornwood Drive, SR-16 corridor.
How Pallet Flow Rack Works
Load one side, pick the other, and let gravity enforce first in, first out.
Load end
Pallets enter at the high end of the lane. Each new pallet stages behind the one before it, so put-away is a single move made from the load-side aisle.
Gravity conveyor
Full-width rollers or skate-wheel tracks, set on a pitch calculated for the pallet weight, carry loads forward under control rather than free rolling.
Braking and separation
Brake rollers and pallet separators regulate travel and stop pallets from bunching, protecting both the product and the structure underneath it.
Pick end
Pickers work a face of first-in pallets. Pull one and the next indexes forward automatically, so the pick aisle stays organized without anyone re-facing stock.
What a Newark Pallet Flow Rack Project Includes
Work on a pallet flow rack project for a Newark building starts with the load profile: pallet weight and dimensions, how many SKUs need dedicated lanes, and how strict the rotation requirement is. Those answers set lane pitch, incline angle and roller or wheel-track spec.
Pallets enter at the high end and travel down braked rollers or wheel tracks, arriving at the pick face in load order. Because loading and picking happen on opposite ends, the layout needs a clear aisle on both sides, which changes bay spacing compared to a single-aisle system.
For buildings around Newark Industrial Park and the Port Authority campus along Thornwood Drive, lane count and aisle widths are drawn against the building's clear height and column grid, then compared to a plain selective layout at the same footprint so the added floor cost of the second aisle is weighed against the rotation it buys.
Installation follows the approved layout: frames are anchored and plumbed, rollers or wheel tracks set to the correct pitch, and brakes checked on each lane before loading. Lanes are labeled with rated capacity and pick direction, and later additions are drawn off the original plan. Any revisions to the layout after the initial walkthrough are priced and documented before steel is ordered, so the scope stays tied to what was actually measured on site.
Recent Installations
Racking projects completed for warehouses across Central Ohio.










Get a Pallet Flow Rack Quote for Your Newark Warehouse
Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call 614-379-4436.
Columbus Pallet Rack
4551 Wright Ave.
Unit #2092
Columbus, OH 43213
614-379-4436Monday - Friday: 8:00 AM - 6:00 PM
Pallet Flow Rack Questions We Hear Most
Warehouse Storage Services in Newark

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Drive-In Rack
Storage lanes replace internal access aisles. Forklifts enter the structure to handle bulk pallets.
View details
Cantilever Rack
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Warehouse Relocation
Moving buildings without losing the racking plan that already works for your operation.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers Central Ohio, so one team can handle multiple buildings for the same company.
Where We Work
Located in Columbus, we serve the entire Greater Columbus region with industrial pallet racks and warehouse storage solutions.
Columbus Pallet Rack
Address
4551 Wright Ave.
Unit #2092
Columbus, OH 43213
Phone
614-379-4436Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Pallet Flow Rack in Newark?
Call 614-379-4436 or request a quote and we will get a layout started.